The run must expose stem bridging
Photograph and classify stem bridging, product damage or a pod crossing the seal whenever it appears.
Link the event to gentle weighing and a wide unobstructed discharge route, the recipe and operating phase.
Preserve both the rejected larger formed pouches with enough mouth clearance for irregular pieces and recovered sample.
Start the setup with long pods
Identify the lot used for long pods, sharp stems, low bulk density and breakage and its conditioning history.
Check flow again after refill and near low level in gentle weighing and a wide unobstructed discharge route.
Accept a substitute only when it can classify intact and damaged peppers while sampling accepted seals.

Observe gentle weighing and a wide unobstructed discharge route as one sequence
Observe gentle weighing and a wide unobstructed discharge route from loading to the finished pack.
Identify which setting protects larger formed pouches with enough mouth clearance for irregular pieces at each handoff.
Re-run the stop condition most likely to cause stem bridging, product damage or a pod crossing the seal.

Approve the drawing for larger formed pouches
Treat larger formed pouches with enough mouth clearance for irregular pieces as a machine interface, not an artwork file.
Confirm guides, forming and sealing while the line handles long pods, sharp stems, low bulk density and breakage.
When geometry changes, list the parts that control stem bridging, product damage or a pod crossing the seal.
| Decision for whole dry-pepper pouches | Condition to establish | Record to retain |
|---|---|---|
| Material: long pods, sharp stems, low | long pods, sharp stems, low bulk density and breakage | Phase-labelled observations for long pods, sharp stems, low bulk |
| Pack: larger formed pouches with enough | larger formed pouches with enough mouth clearance for irregular pieces | Signed drawing and retained samples for larger formed pouches with enough mouth |
| Sequence: gentle weighing and a wide | gentle weighing and a wide unobstructed discharge route | Named parts and recipe for gentle weighing and a wide unobstructed |
| Reject: stem bridging, product damage | stem bridging, product damage or a pod crossing the seal | Correction and restart evidence for stem bridging, product damage |

Use run phases to classify intact and damaged peppers while sampling accepted seals
Before the line starts, agree how the run will classify intact and damaged peppers while sampling accepted seals.
Separate setup and production evidence for long pods, sharp stems, low bulk density and breakage.
Retain the first conforming larger formed pouches with enough mouth clearance for irregular pieces after each correction.
What remains outside the purchase guarantee
Legacy planning fields for whole dry-pepper pouches must be reconciled against long pods, sharp stems, low bulk density and breakage before they enter a quotation.
The signed scope for larger formed pouches with enough mouth clearance for irregular pieces should identify the fitted sequence for gentle weighing and a wide unobstructed discharge route and the material lot used in testing.
When evidence for stem bridging, product damage or a pod crossing the seal is incomplete, keep the disputed model or range qualified.
Keep unresolved utility and weight claims out of the quotation.
Validate them with long pods, sharp stems, low bulk density before release.
Record long pods, sharp stems, low bulk density and breakage with lot identity and conditioning.
Approve larger formed pouches with enough mouth clearance for irregular pieces as the revision-controlled input.
Demonstrate gentle weighing and a wide unobstructed discharge route with named installed parts.
Classify stem bridging, product damage or a pod crossing the seal during the factory run.

Buyer questions for the production trial
How do operators remove seeds and fragments from transfer corners?
Operators must remove seeds and fragments from transfer corners and guards, verify reassembly and retain the first conforming pack after restart.
Can another lot reproduce long pods, sharp stems, low bulk?
It must reproduce long pods, sharp stems, low bulk density and breakage under the same pack and operating conditions; otherwise the production lot is required.
Can the run classify intact and damaged peppers while sampling?
A traceable run must classify intact and damaged peppers while sampling accepted seals, with rejects and interventions counted separately.
Does the drawing cover larger formed pouches with enough mouth clearance?
The controlling interface is larger formed pouches with enough mouth clearance for irregular pieces, supported by a signed revision and retained samples.
Conclusion
Release whole dry-pepper pouches only after the intended material passes through gentle weighing and a wide unobstructed discharge route into the approved pack.
The acceptance record should connect stem bridging, product damage or a pod crossing the seal to the cleaning method: remove seeds and fragments from transfer corners and guards.
Use the related product category to compare larger formed pouches with enough mouth clearance for irregular pieces; the production file should retain pepper size grading, drop setup, pouch drawing and damage results.





Tel: +8617350750975
Email: info@vffspackingmachinery.com
MP/WhatsApp: +8617350750975
Manufacturer Address:Meixi Road, Tongan District, Xiamen,Fujian,China




